How to Transport and Install Large Drum Aerobic Fermentation Equipment?
Commonly, intelligent aerobic fermentation system holds very large dimension. For sake of transportation convenience, supplier always cut drum into sections during manufacturing process and reserve docking position. Once arriving at working site, customers can arrange personnel to dock, weld, calibrate, fix, install and debug.
In fact, besides large drum body, other auxiliary machine size of the intelligent aerobic fermentation system is also not small. Therefore, while fabrication and manufacturing process, supplier has already taken transportation and installation convenience into consideration. For example, belt conveyor will be cut into 12-15 meters sections. Belt will be docked through sulfide method or buckle on site. According to types, sludge silos is divided into hydraulic arch breaking type and auger arch breaking type. In order to avoid super elevation and weight limit, silos are always docked by flange during manufacturing and transporting process. Generally speaking, screen machine and mixer will not exceed required height and width limit. Main body of them can be delivered in one lot. Workers can install support stand for them on site. Other parts like cable, duct, cable tray and screw conveyor are always loaded and transported in one whole body.
For more details, you must entrust professional and strong suppliers like Zonelion Taeda to assist you. Large scale equipment installation work needs to be done under cooperation among various shifts. Not only corresponding plan shall be formulated first, but also need rich experience to solve various problems. Our engineer Liu once told us an anecdote from sludge fermentation harmless disposal site in Wuhai.
Before delivering dynamic aerobic drum fermentation equipment, we have notified customer in advance that workshop room must be added after equipment set on place. When our installation team arrive at Wuhai site, they are surprised for what they saw. It is true that top room has not been finished and there is space reserved for installation work. But, position is awkward, only permits entrance of one crane. Our installation works have to rely on only one crane to set equipment on place by using chain and forklift in a very difficult condition.
Finally, installation work is accomplished without dismantling top room and changing workshop frame.
Therefore, fabrication and installation work for large drum dynamic aerobic fermentation equipment must be done by manufacturer with rich experience, reliable qualification and strong ability. If you only pursue low price, commissioning, installation and running work will be hard to proceed because of low price.
Author of this article is Ms Tiantian Zhu of ZONELION Taeda®. Copyright reserved.
- 2016-01-12OSC-II Model Sludge Dryer Deliv
- 2016-01-1215T/Day Aerobic Dynamic Ferment
- 2016-01-12Matters Should Be Paid Attentio
- 2016-01-12Methods exploration of chemical
- 2016-01-12Analysis of circulating fluid b
- 2016-01-12Comparison Between Different Sl
- 2016-01-12Adding Calcium and Stable Dispo
- 2016-01-12Sludge Treatment: Methods for S
- 2016-01-12Use Dyeing Sludge As Resource
- 2016-01-12Current situation of sludge dis
Hot spots
Hot-sale products
- Leather Industry Sludge Drying
Production Capacity:1-2200t/h
- Welding Plating Sludge Drying S
Production Capacity:1-2200t/h
- Municipal Sludge Drying Solutio
Production Capacity:1-2200t/h
- Manure Sludge Drying Solution
Production Capacity:1-2200t/h